CHAPTER ONE
INTRODUCTION
1.0 Background to the study
The successful
completion of any project depends on proper management. The overall planning,
control and co-ordination of a project from inception to completion ensures
value for the client’s money and also increase productivity and profit of a
firm. Thus management as defined by Day (1994) is the process of securing a
facility which fully satisfies a client’s requirements within the approved time
and cost. Frank. II & Ronald M C (2001) defined management as coordinating
and controlling and controlling all aspect of the project, overall planning,
controlling and coordination of the design and constructing process from
inception hand over.
Albert & Benjamin
Ross (2008) defined management as the application of knowledge, skill, tools
and techniques to project in order to meet project needs.
According to advance
dictionary productivity is defined as the ratio of the quality and quantity of
units produced to the labour per unit of time difficult measure at best is
usually attributed to the improved efficiency of some specific resource
capital, money, materials or technology.
In the past year the
contractors output in relation to the available resources has been one of the
major problems of the contractors. Productivity has been low blames were always
shifted either to the supervisor or the labourers on the sites. But nobody has
voluntarily accept the fact that low productivity and profit is due to
inability to manage and direct the workers towards achieving a good result. The most important
factors that improve productivity and profit depend on management; effective
planning, more effective job procedures, better communications, more effective
human resources policies, improved decision making etc.
Experience
has shown that through better contract management there is always room for
improvement in the execution of project by construction firms, the overall time
taken is often well in excess of what it could have been if appropriate
managerial techniques designed for better productivity were carefully
implemented to minimize lost man-hours.
In
construction firms the purpose and function of management activity is to enable
the building operation to be carried through smoothly, effectively and
economically. This
management principles and techniques can be developed and improved efficient
production so as not only to lower cost and raise profit, but also to make
possible increase pay for workers through their higher productivity.
With this background,
this study/project wants to look into the management principles and technique
and how they can be used as tools to achieve maximize productivity and
profit.
1.1 Statement of Problem
Ineffective contract;
management has brought about reduction in, productivity and profit in
construction firm especially indigenous firms, many project are usually abandon
due to poor planning, lack of effective co-ordination arid poor funding.
1.2 Research
Question
In-order to guide the study and achieve
the above stated research objectives; the following research questions were
formulated:
1. What
are the factors affecting low productivity in construction industries?
2. What
were the criteria being used for management process?
3. What
are the types of management skills tools used in construction industries?
4. What
are the resource as an essential element in profit planning?
1.3 Aim
The aim of this study
is to find out the impact of management skills of indigenous contractors on
productivity and profit.
1.4 Objectives
1.
To identify the various management
process and techniques that can be used by contracting firms
2.
To assess the amount of management skill
is possessed and used by indigenous contractors
3.
To identify the effect of possession and
the use of adequate management skills on the profit of a firm.
4.
To determine the effect of application
of good management techniques on productivity of a firm.
1.5 Significance of the Study
Productivity and Profit
are key resources on building projects. However to realize full economic from
productivity and profit issue must be addressed in all contracting
organization. Productivity and profit are one key component to every companies
success and competitiveness in the market. Declining productivity and profit
across nation causes abandon of project.
1.6 Scope of Study
·
The scope of this study is to examine
the impact of effective contract management on construction firms and determine
the overall result with respect to maximum productivity and profitability.
·
The research is limited to such
activities on site, as regards the management capacity, labour, plant and
materials.
·
Construction firms in Abeokuta south and
Obafemi owode have been chosen as the case study because of the highly
concentration of construction firm in these areas.